Sign In | Join Free | My ecer.co.uk |
|
Brand Name : OZ
Model Number : FYD-W014
Certification : GB/T2009-2001 ,ISO9001:2008 , ISO 14001:2004 , AFRDI
Place of Origin : Henan, China
MOQ : 50pcs
Price : 20-50pcs
Payment Terms : L/C, T/T
Supply Ability : 20000pcs Per Month
Delivery Time : 25 working days
Packaging Details : Standard Exporting Package
Product name : Three drawer steel cupboard
Material : Cold rolling steel
Demention : H1850*W900*D400mm or customized
Structure : KD or Assembly Structure
Surface : Electrostatic powder coating
Specific use : Filing Cabinet
Warranty : 5 Years
Color : Any RAL color available
Thickness : 0.5-1mm
MOQ : 50 pieces
Chinese Factory Manufacturing Three Drawer Steel Cupboard KD Structure
Product Specification:
Name | Chinese Factory Manufacturing Three Drawer Steel Cupboard KD Structure |
Size | H1850*W900*D400mm, Customization size is welcomed. |
Material | High quality cold rolling steel |
Thickness | 0.6mm as regular; 0.5mm-1.2mm optional |
Packing details | Packing volume: 0.17cbm, Knock down, in multi-layer carton box with polyfoam inner lining |
Surface | Environment protection powder coating |
Color | Different colors are available according to the RAL |
Accessories | Handles and lock are customized |
Certificates | GB/T2009-2001 ,ISO9001:2008 , ISO 14001:2004 , AFRDI |
Structure | Knock Down structure, and supply installation video or instruction manual |
loading quality(Pcs) | 164pcs/20GP, 400PCS/40GP |
Payment term | L/C at sight, Or 30% deposit TT in advance, 70% balance against finished the production. |
Usage | Office furniture/school furniture/hospital furniture |
Advantage | 1. Waterproof, corrosion resistance |
2. Sturdy construction, wear resistance, high load bearing | |
3. Easy to install, clean and maintain | |
4. QC inspect in production, avoid any mistake 100% re-inspect before packing, double ensure all product are perfect | |
5. Hygienic, environment-friendly |
Main advantages of steel cupboard with 3 drawer
1. Knock down structure, easy assembling, convenient for delivery
2. More diversified storage function.
3. Adjustment shelves.
4. Loading capability for each shelf : 35 kg
5. Handle:Metal, Plastic, Aluminium alloy, chrome plate,customized
6. Widely used in different area.
Product-size Show:
Product show :
Application show:
Details display:
Packaging Details:
1. With polyfoam inner lining and multi-layer carton box, tape sealing and packing belt to reinforce (wooden box available if LCL).
2. Logo, product sketch or shipping mark can be customized as per your request.
3. With detailed installation instruction and installation video.
Quality control:
1.Raw material: Long term cooperated supplier for stable offering raw material, and we also have strict rule for raw material inspection and control before in warehouse
2.We have QC inspect on production line all the time.
3.Spot inspection for finished products before loading.
Q&A
*How can I get to your factory for a visit?
Our factory is in Luoyang, Henan, China, you can get to Luoyang by airpaine or high-speed train, and we will pick you up there.
*What is your MOQ?
Our MOQ is 50pcs both for regular and custom products. Sample order is also acceptable.
*How long is your delivery time?
It depends on your quantity, usually for 25-30 days,a little longer for the tailored products.
*Where is your loading port?
Our loading port is in Qingdao,which is the fourth largest port in China.
*If I need a locker as per my specification,is that ok?
We provide OEM&ODM service, color and size customization approval.
*How long will it take from Luoyang airport to your factory?
It'll take about 50mins from Luoyang airport to our factory and 40mins from high-speed railway station.
![]() |
Thickness 0.5-1mm 3 Drawer Metal File Cabinet KD Structure Images |